Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T18CM02924

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
12/18/2018 ENGINEERING - FINAL Approved
10/17/2018 ENGINEERING - FINAL Partial Approval COMPLET ALL NOTES ON DEVELOPMENT PACKAGE DP16-0084
08/06/2018 ENGINEERING - FINAL Partial Approval COMPLETE ALL WORK SHOWN ON THE APPROVED PLANS
05/09/2018 ENGINEERING - FINAL Partial Approval 1) THE AC AND ELECTRICAL CONTAINMENT DOES NOT HAVE AN ACCESS THAT NEEDS TO BE PROVIDED. THE ACCESS INTO THIS AREA EITHER NEEDS TO BE BARRICADED TO PREVENT ACCESS TO THE GENERAL PUBLIC OR A GATE AND LOCK NEEDS TO BE PROVIDED FOR SECURITY.
2) SOME OF THE ELECTRICAL CONDUITS FOR THE FUTURE LIGHTING HAVE NBEEN WRAPPED WITH PLASTIC TAPE AND CREATE A TRIP HAZARD AT THIS TIME. THERE IS NO ENERGIZED WIRES AT THIS LOCATION AT THIS TIME.
3) THE LANDSCAPING AND IRRIGATION ALONG THE EAST AND SOUTHSIDE OF THE BUILDINS NEED TO HAVE BARRIER FENCE RE-ESTABLISHED TILL ALL OF THE WORK IS COMPLETED PER THE APPROGVED PLANS.
4) THE EXTERIOR LIGHTING HAS NOT BEEN COMPLETED AT THIS TIME, THESE AREAS NEED TO BE SCREENED OFF FROM PUBLIC ACCESS.