Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2019 | BUILDING - FINAL | Approved | ||
| 10/30/2019 | BUILDING - FINAL | Denied | 1- Shall caulk the Drinking Fountains. 2- Shall provide an expansion tank at Water Heater. 3- Shall provide the manufacturer installation standards for information on the position of the gas regulators. 4- Shall provide (3) sheet metal screws per joints on all suspended heaters flu vents. 5- Shall provide minimum of 6 inches of discharge tube from the critical level to the top of the Urinal for the flush valve. 6- Shall locate the Accessible signage to the restrooms on the latch side of door. 7- Shall provide minimum of 10 seconds of flow for all accessible lavatories. |