Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2018 | EXCAVATION/LAYOUT REBAR & ZON | Approved | Ray-Supervisor | |
| 06/22/2018 | EXCAVATION/LAYOUT REBAR & ZON | Correction Required | Sleeve ABS through structural masonry footing for structural support. All ABS DWV plumbing requires slope to drain, level out Closet Flange. 10 foot head of water or air test required for DWV testing. All rebar to have min 3" separation from earth/dirt. Slab grade reinforcement OK to be 2" above dirt. Clean up the work area so as not to be a harzard for workers and inspectors. Existing slabs/concrete that will be in the new pour shall not compromise the ne work and concrete being poured. Finish corrections and recall inspection. |