Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T18CM02368
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/13/2020 | PLUMBING - FINAL | Approved | REVIEW OF WATER DISINFECTION REPORT COMPLETED | |
02/11/2020 | PLUMBING - FINAL | Partial Approval | Need chlor test | |
05/02/2019 | PLUMBING - FINAL | Partial Approval | 1- Shall provide accessible signage at restrooms. 2- the Mop sink faucet is loose. 3- Shall provide a strap on the floppy conduit for the water heater disconnect. 4- Shall provide locking caps for the condenser refrigeration service ports. 5- Shall seal piping penetrations at east exterior wall. Note; recommend temp C of O. |
|
06/19/2018 | PLUMBING - FINAL | Prior to Final Inspectn | WATER CHLORINATION REPORT REQUIRED |