Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2018 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | provide 3" clearence from earth to reinforcing steel provide minimum 40 bar diameters overlap at re bar waste piping within concrete to be wrapped |
|
| 06/05/2018 | EXCAVATION/LAYOUT REBAR & ZON | Approved |