Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T18CM02298
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/20/2019 | ENGINEERING - FINAL | Approved | ||
12/19/2019 | ENGINEERING - FINAL | Partial Approval | Pending approval revision. | |
11/29/2019 | ENGINEERING - FINAL | Partial Approval | OK FOR TCO PER ALL OTHER APPROVALS, SITE NEEDS TO HAVE THE REVISED DRAWINGS SUBMITTED AND APPROVED FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE. PROVIDE A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR TH DEVELOPMENT PACKAGE DP18-0016, AS WELL AS THE NOTICE OF TERMINATION FROM ADEQ FOR THE DEVELOPMENT PACKAGE. | |
11/06/2018 | ENGINEERING - FINAL | Continued | Walked site with GC. went over trash enclosure. | |
09/11/2018 | ENGINEERING - FINAL | Continued | WORKING ON OVER-XING. | |
08/22/2018 | ENGINEERING - FINAL | Continued | MET WITH GC ON SITE WENT OVER SWPPP CONTOLS. |