Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T18CM02258

Parcel: 136300960

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T18CM02258

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
07/09/2018 PLUMBING - INTERMEDIATE Approved
07/02/2018 PLUMBING - INTERMEDIATE Partial Approval VENT LINES AND DOMESTIC WATER LINES NEED TO BE FILLED WITH WATER AT TIME OF INSPECTION TO TEST FOR LEAKS.
05/18/2018 PLUMBING - INTERMEDIATE Partial Approval SUPPORT T&P PIPING. 2" VENT THROUGH ROOF ON SHOWER IS NOT IN WALL, PLAN NEEDS REVISION IF TIEING IN TO OTHER VENT. SUPPORT COPPER PIPES AT 90'S AT ANGLE STOPS.
04/26/2018 PLUMBING - INTERMEDIATE Not ready for Inspection FLU-PIPING NOT ROUGHED IN, WATER HEATER PLATFORM NOT INSTALLED, SUPPLY LINES TO WATER HEATER WILL BE TO LOW. T&P NOT ROUGHED IN, TOILET FLANGE NOT AT FLOOR LEVEL. ANOTHER FAILED INTERMEDIATE INSPECTION MAY RESULT IN A RE-INSPECTION FEE.
04/20/2018 PLUMBING - INTERMEDIATE Not ready for Inspection MULTIPLE THINGS WRONG. PLUMBER NEEDS TO FINISH ROUGHING IN BEFORE TIME OF INSPECTION.
04/12/2018 PLUMBING - INTERMEDIATE Not ready for Inspection VENT LINES NEED SECURING AND FILLED WITH WATER, PIPING OUTSIDE OF WALLS, STOPPED INSPECTION