Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T18CM02116
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/20/2019 | ENGINEERING - FINAL | Approved | ||
02/19/2019 | ENGINEERING - FINAL | Not ready for Inspection | Contractor painting over door way. Sidewalk broken in 2 places. Landscaping in progress, much dirt on the sidewalks. Note development package permit for the site has not been completed | |
02/01/2019 | ENGINEERING - FINAL | Not ready for Inspection | The project is still under construction, there’s temporary fencing, scaffolding, temporary toilets, and a job trailer still in place. Landscaping shown on T18CM08194 for the hobby lobby shelf has not yet been installed. Complete all work required then recall for inspection when you’re ready | |
12/07/2018 | ENGINEERING - FINAL | Not ready for Inspection | Met GC Kevin in his trailer. Subcontractor performing sidewalks and Landscaping outside of building, no plans on site |