Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/19/2019 |
ENGINEERING - FINAL |
|
Approved |
|
| 04/24/2019 |
ENGINEERING - FINAL |
|
Partial Approval |
OK FOR TCO. FINAL NOT TO BE GIVEN TILL ALL WORK HAS BEEN COMPLETED FOR DP18-0046 AND IT IS APPROVED. THE ADA HANDICAP SPOTS WILL NEED TO BE CHECKED TO VERIFY THAT THEY ARE WITHIN COMPLIANCE, INSTALL THE LONGTERM BICYCLE PARKING, REESTABLISH THE WATER HARVESTING BASIN WEST OF THE NEW BUILDING, COMPLETE LANDSCAPING AS NEEDED. |
| 04/19/2019 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Engineering inspector has no issues that would prevent a temporary c of o. Development package work still needs to be completed |
| 03/27/2019 |
ENGINEERING - FINAL |
|
Denied |
The job is roughly one month away from completion. I met with Charlie from Chestnut at 975-3323 I spoke with him about his development package plans and permit. I requested that he schedule a preconstruction meeting under DP 18–0046 |