Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2018 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
| 06/21/2018 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Corrections. Rebar in footing, see Page A-3 Detail 1 and other footing/slab details. Engineered plan. Footing depth aand width and slab grade not as per approved plan. Hang all anchor bolts per AB detail on plan Finish all corrections per plan and call for reinspection. May be other corrections upon reinspection. |
|
| 06/14/2018 | EXCAVATION/LAYOUT REBAR & ZON | Denied | 1. REBAR TOO HIGH IN S.E. CORNER. 2. DOWEL ALL EXISTING SLAB PER PLAN. 3. BEFORE CONCRETE POUR- RECOMMEND INSTALLING UFER FOR FUTURE SERVICE INCREASE. UFER MUST BE INSPECTED BEFORE POUR. 4. RE-WRAP PLUMBING WHERE IT IS COMING OFF. 5. FYI - WATER HEATER FLUE DOES NOT MEET CODE. |