Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T18CM01942
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/25/2018 | ENGINEERING - FINAL | Approved | ||
10/18/2018 | ENGINEERING - FINAL | Not ready for Inspection | ||
10/17/2018 | ENGINEERING - FINAL | Not ready for Inspection | There was no sip required for this job. Provide striping shown and certification letter from the engineer of record for this site. |
|
10/11/2018 | ENGINEERING - FINAL | Partial Approval | Site IS OK FOR A TCO FOR STOCKING PURPOSES ONLY AT THIS TIME TILL ALL OF THE EXTERIOR WORK IS COMPLETED. I WILL RE-INSPECT THIS SITE ON 10/15/2018 TO SEE IF IT WOULD BE ACCEPTABLE FOR A TCO FOR CUSTOMERS. |