Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/25/2018 | ENGINEERING - FINAL | Approved | ||
| 10/18/2018 | ENGINEERING - FINAL | Not ready for Inspection | ||
| 10/17/2018 | ENGINEERING - FINAL | Not ready for Inspection | There was no sip required for this job. Provide striping shown and certification letter from the engineer of record for this site. |
|
| 10/11/2018 | ENGINEERING - FINAL | Partial Approval | Site IS OK FOR A TCO FOR STOCKING PURPOSES ONLY AT THIS TIME TILL ALL OF THE EXTERIOR WORK IS COMPLETED. I WILL RE-INSPECT THIS SITE ON 10/15/2018 TO SEE IF IT WOULD BE ACCEPTABLE FOR A TCO FOR CUSTOMERS. |