Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/20/2019 |
ENGINEERING - FINAL |
|
Approved |
AJ with Chestnut construction, will make the final connections from the scuppers to the sidewalk strippers. |
| 08/02/2019 |
ENGINEERING - FINAL |
|
Partial Approval |
FINAL NOT TO BE GIVEN TILL THE ROOF DRAINAGE HAS BEEN CORRECTED OR APPROVED BY THE ENGINEERING AND ZONING REVIEWERS IN ITS CURRENT CONDITIONS. |
| 04/15/2019 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
The ADA handicap parking spaces have been relocated on site but may not make for compliancy. I will contact Steve Shields or Alexandra homes and discuss this site to see if this noncompliant space is accessible or has to be made fully complian |