Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2019 | MECHANICAL - INTERMEDIATE | Approved | finish ducting supply air in field services area. | |
| 05/22/2019 | MECHANICAL - INTERMEDIATE | Partial Approval | 2nd floor west side conference | |
| 03/13/2019 | MECHANICAL - INTERMEDIATE | Partial Approval | restrooms only by break room 104 | |
| 02/15/2019 | MECHANICAL - INTERMEDIATE | Partial Approval | Main call center second floor above grid components OK to drop tile. Two first floor and two second floor bathrooms sink plumbing OK to cover. |
|
| 11/21/2018 | MECHANICAL - INTERMEDIATE | Partial Approval | above ceiling in training room b okay | |
| 10/09/2018 | MECHANICAL - INTERMEDIATE | Partial Approval | 1- DWV water test provided for the Center Restrooms. 2- All corrections for HVAC ducts completed as requested. 3- Overhead and in wall domestic water distribution okay, air pressure test provided for the Center Restrooms only. |
|
| 10/08/2018 | MECHANICAL - INTERMEDIATE | Not ready for Inspection |