Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ABOVE CEILING
Permit Number - T18CM01852
Inspection Description - PLUMBING - ABOVE CEILING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2019 | PLUMBING - ABOVE CEILING | Approved | ||
03/18/2019 | PLUMBING - ABOVE CEILING | Partial Approval | ok to cover for break room 104 and its 2 bathrooms | |
03/14/2019 | PLUMBING - ABOVE CEILING | Partial Approval | DWV at break room bathrooms only | |
02/15/2019 | PLUMBING - ABOVE CEILING | Partial Approval | Main call center second floor above grid components OK to drop tile. Two first floor and two second floor bathrooms sink plumbing OK to cover. |
|
01/29/2019 | PLUMBING - ABOVE CEILING | Partial Approval | South training room second floor OK | |
12/21/2018 | PLUMBING - ABOVE CEILING | Partial Approval | First floor. | |
11/21/2018 | PLUMBING - ABOVE CEILING | Partial Approval | training room b okay. | |
10/09/2018 | PLUMBING - ABOVE CEILING | Partial Approval | 1- DWV water test provided for the Center Restrooms. 2- All corrections for HVAC ducts completed as requested. 3- Overhead and in wall domestic water distribution okay, air pressure test provided for the Center Restrooms only. |