Date Description Inspector Results Comments
07/12/2019 PLUMBING - INTERMEDIATE Approved
03/18/2019 PLUMBING - INTERMEDIATE Partial Approval for break room 104 and its 2 bathrooms
ok to pour plumbing trenches in break room 104
03/14/2019 PLUMBING - INTERMEDIATE Partial Approval DWV at break room bathrooms only
02/15/2019 PLUMBING - INTERMEDIATE Partial Approval Main call center second floor above grid components OK to drop tile.
Two first floor and two second floor bathrooms sink plumbing OK to cover.
01/17/2019 PLUMBING - INTERMEDIATE Partial Approval toilet flanges OK
11/21/2018 PLUMBING - INTERMEDIATE Partial Approval electric hot water room okay.
10/09/2018 PLUMBING - INTERMEDIATE Partial Approval 1- DWV water test provided for the Center Restrooms.
2- All corrections for HVAC ducts completed as requested.
3- Overhead and in wall domestic water distribution okay, air pressure test provided for the Center Restrooms only.
10/08/2018 PLUMBING - INTERMEDIATE Not ready for Inspection