Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T18CM01852
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2019 | PLUMBING - INTERMEDIATE | Approved | ||
03/18/2019 | PLUMBING - INTERMEDIATE | Partial Approval | for break room 104 and its 2 bathrooms ok to pour plumbing trenches in break room 104 |
|
03/14/2019 | PLUMBING - INTERMEDIATE | Partial Approval | DWV at break room bathrooms only | |
02/15/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Main call center second floor above grid components OK to drop tile. Two first floor and two second floor bathrooms sink plumbing OK to cover. |
|
01/17/2019 | PLUMBING - INTERMEDIATE | Partial Approval | toilet flanges OK | |
11/21/2018 | PLUMBING - INTERMEDIATE | Partial Approval | electric hot water room okay. | |
10/09/2018 | PLUMBING - INTERMEDIATE | Partial Approval | 1- DWV water test provided for the Center Restrooms. 2- All corrections for HVAC ducts completed as requested. 3- Overhead and in wall domestic water distribution okay, air pressure test provided for the Center Restrooms only. |
|
10/08/2018 | PLUMBING - INTERMEDIATE | Not ready for Inspection |