Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING ABOVE CEILING
Permit Number - T18CM01852
Inspection Description - BUILDING ABOVE CEILING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/26/2019 | BUILDING ABOVE CEILING | Approved | Field services and training academy areas OK | |
06/17/2019 | BUILDING ABOVE CEILING | Partial Approval | Conference room and offices in middle area second-floor ok. | |
06/06/2019 | BUILDING ABOVE CEILING | Partial Approval | east conference room, and corridors outside middle offices ok. | |
05/28/2019 | BUILDING ABOVE CEILING | Partial Approval | Break-room & North training room ok to tile drop ceiling. | |
05/01/2019 | BUILDING ABOVE CEILING | Partial Approval | 2nd floor east side offices ok for drop ceiling | |
03/13/2019 | BUILDING ABOVE CEILING | Partial Approval | restrooms only by break room 104 | |
02/15/2019 | BUILDING ABOVE CEILING | Partial Approval | Main call center second floor above grid components OK to drop tile. Two first floor and two second floor bathrooms sink plumbing OK to cover. |
|
01/29/2019 | BUILDING ABOVE CEILING | Partial Approval | South training room second floor OK | |
12/21/2018 | BUILDING ABOVE CEILING | Partial Approval | First floor. | |
11/21/2018 | BUILDING ABOVE CEILING | Partial Approval | training room b okay | |
10/09/2018 | BUILDING ABOVE CEILING | Partial Approval | 1- DWV water test provided for the Center Restrooms. 2- All corrections for HVAC ducts completed as requested. 3- Overhead and in wall domestic water distribution okay, air pressure test provided for the Center Restrooms only. |
|
10/08/2018 | BUILDING ABOVE CEILING | Partial Approval | Gang restrooms ok |