Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
Permit Number - T18CM01852
Inspection Description - FRAMING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/26/2019 | FRAMING | Approved | ||
06/06/2019 | FRAMING | Partial Approval | training academy area ok | |
05/22/2019 | FRAMING | Partial Approval | 2nd floor offices 3, 4, and 5. Ok to cover | |
05/09/2019 | FRAMING | Partial Approval | 2nd floor west side training room, storage room, north wall of break room and offices 6, 7, and 8. Ok to sheet rock. | |
05/01/2019 | FRAMING | Partial Approval | 2nd floor east side conference room soffit | |
04/18/2019 | FRAMING | Partial Approval | photo/film area OK | |
03/21/2019 | FRAMING | Partial Approval | ||
03/18/2019 | FRAMING | Partial Approval | break room 104 north wall ok to cover | |
03/13/2019 | FRAMING | Partial Approval | restrooms only by break room 104 | |
02/26/2019 | FRAMING | Partial Approval | West stairwell wall frame ok | |
02/06/2019 | FRAMING | Partial Approval | South and east exterior walls OK to cover | |
01/29/2019 | FRAMING | Partial Approval | west stairwell and photo area OK | |
01/25/2019 | FRAMING | Partial Approval | Demising wall ok to one side. | |
11/28/2018 | FRAMING | Partial Approval | room 208 ok. Furred out wall in training area okay. First Floor conference room soffit okay. | |
11/21/2018 | FRAMING | Partial Approval | West End of electrical room okay. West stair second floor wall okay. | |
11/01/2018 | FRAMING | Partial Approval | 1- Steel reinforcement provided in footings located on column line 2 and between Grid line H thru E is okay for concrete. 2- Framing and electric conductors and metal boxes located on the 2nd floor north wall training room and 1st floor Conference Room #126 East wall only is okay to cover. |
|
09/26/2018 | FRAMING | Partial Approval | Call center 1st floor ok except restrooms. | |
09/20/2018 | FRAMING | Partial Approval | C.L. E,F,G ok to 1 side |