Inspection Status: Partial Approval
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/06/2020 |
ENGINEERING - FINAL |
|
Partial Approval |
IS PARTIAL AT THIS TIME, OK FOR A TCO, FINAL PENDING THE CLOSURE OF THE DEVELOPMENT PACKAGE FOR THIS SITE |
| 11/06/2020 |
ENGINEERING - FINAL |
|
Approved |
IS APPROVED AT THIS TIME |
| 11/03/2020 |
ENGINEERING - FINAL |
|
Partial Approval |
Partial approval. Grades for landscaping OK per engineer of record no need for water harvesting. Per conversation with Dave Roberts. |
| 10/27/2020 |
ENGINEERING - FINAL |
|
Partial Approval |
Partial approval. OK for TCO only stocking only. Complete all work on approved plans for final approval. |
| 08/14/2020 |
ENGINEERING - FINAL |
|
Partial Approval |
ROOF DRAINS ON PORCH DETERMINED TO NOT AFFECT PEDESTRIAN CIRCULATION |
| 06/26/2020 |
ENGINEERING - FINAL |
|
Continued |
IS CONTINUED AT THIS TIME, INFORMATIONAL SITE VISIT FOR WHAT WILL BE REQUIRED FOR A TCO IN THE FUTURE. |
| 06/26/2020 |
ENGINEERING - FINAL |
|
Continued |
CONTINUED AT THIS TIME, INFORMATIONAL SITE VISIT FOR WHAT WILL BE REQUIRED FOR A TCO IN THE FUTURE. CURRENTLY THE SITE HAS SOME MINOR ISSUES WITH THIS SITE THAT WILL NEED TO BE ADDRESSED PRIOR TO THE FINAL. THE TRASH ENCLOSURE HAS BEEN CONSTRUCTED BUT WAS INSPECTED ON THE FOOTER ONLY BY DAVID MUNIZ. THIS WILL NEED TO BE CERTIFIED BY THE ENGINEER OF RECORD ONCE IT IS DETERMINED THAT IT IS AN ACCEPTABLE DESIGN. ALL SIDEWALKS STILL NEED TO BE CHECKED FOR COMPLIANCE AS DO THE ADA PARKING SPACES AND ACCESS AISLES. COMPLETE ALL SIDEWALK BITH ON THIS SITE AND WITHIN THE RIGHT OF WAY. COMPLETE ALL LANDSCAPING AS SHOWN ON THE APPROVED PLANS. CHECK ALL DRAINAGE ASPECTS OF THIS SITE, 2 ROOF DRAINS DEPOSIT WATER INTO PEDESTRIAN ACCESS AREAS. |