Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2018 | FIRE - FINAL | Approved | ||
| 10/19/2018 | FIRE - FINAL | Partial Approval | Re-inspection needs to be paid by either united fire or contractor per j. vincent last inspection. Once paid permit will be finaled. Disregard approval on sheet given to contractor on 10/19/18 until paid. | |
| 10/05/2018 | FIRE - FINAL | Partial Approval | Went over a few items with the owner while doing the hood final. We discussed: -needs to get electric under hood to shut down. -needs to verify they have two separate hood permits. -mount extinguishers, including K in kitchen. -remove exit sign above opening that leads to storage and kitchen. two main exits in front meet the requirements for his two required exits. -either remove exit signs in rear or remove latches from chain link fences. -hood is interconnected to FACP which is not listed for commercial fire. vista 20p. advised owner and eric from alarm co. to disconnect hood from panel or install a UL listed dedicated function commercial fire alarm. -add address numbers to rear doors. -obtain op permit for POA. -panic not required on the second exit in front of house. Still needs a fire final inspection. These were items discussed during his first hood final. |