Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2018 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 04/26/2018 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL SEAL ALL OPENINGS AT THE TOP OF THE STRUCTURE. 2- SHALL SHOW ANOTATE ON THE APPROVED PLANS THE 220 RECEPTICAL AND 30 AMP CIRCUIT BREAKER. NOTE; THE STUCCO BROWN COAT APPLICATION IS COMING OFF VERY EASY. CHECK APPLICATION. * |
|
| 04/16/2018 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE A LANDING AT ENTRY WAY. 2- SHALL REMOVE ALL METAL BOXES COVER PLATES FOR VERIFICATION OF GROUND TAILS TO BOX. 3- SHALL LABLE THE ELECTRIC SERVICE PANEL FOR THE DEDICATED CIRCUIT BREAKERS SERVING THE STRUCTURE. 4- RECEPTICAL LOCATED AT THE SOUTH WEST WALL IS NOT SHOWN ON THE APPROVED PLANS. * |