Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/20/2018 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 04/04/2018 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL SECURE THE GAS LINE THAT SERVES THE WATER CLOSET AND DRYER. 2- SHALL PROVIDE THE FLEX CONNECTOR FOR THE GAS PACK ON THE ROOF. 3 SHALL SEAL ALL ROOF JACKS. 4- SHALL PROVIDE A GAS BOND ON THE SYSTEM. 5- SHALL PROVIDE A CARBON MONOXCIDE DETECTOR AND LOCATE NEAR THE APPLIANCES AND AS PER MANUFACTURERS INSTALLATION STANDARDS. 6- SHALL PROVIDE OR EXTEND THE DBL WALL FLU VENT THRU THE CEILING MIN OF 1 INCH BELOW THE CEILING THEN CONNECT THE SINGLE WALL VENT CONNECTOR WITH (3) SHEET METAL SCREWS PER JOINT AND DRAFT COLLAR. 7- SHALL EXTEND THE T & P DRAIN TO DAYLIGHT AND TERMINATE 6 INCHES ABIVE SUB GRADE. * |