Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/29/2019 |
BUILDING - FINAL |
|
Approved |
|
| 01/24/2019 |
BUILDING - FINAL |
|
Partial Approval |
handrail on stairs should return to wall IBC chapter 10 |
| 01/22/2019 |
BUILDING - FINAL |
|
Not ready for Inspection |
Fire corrections. Corrections on electrical and plumbing. On page A4.0 the second floor of this addition and the stairwell going to the second floor are shown as attic and attic access only. If this floor is used as anything else other than an attic this area will not meet code |