Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2018 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 1- CLEAR GAS METER |
|
| 03/04/2018 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | PART OF GAS PIPING WAS REPLACED NEED GAUGE FOR PRESSURE TEST, VENTING ON WATER HEATER NEEDS SCREWS AS WELL AS TAPE, DOOR NEEDS VENTILATION AT BOTTOM, MIDDLE CONNECTION BY WATER HEATER NEEDS TAPE, CHECK SPACING FROM WALL |