Permit: T18CM01538

Parcel: 116211260

Inspection Status: Not ready for Inspection

Inspection History: BUILDING - FINAL

Date Description Inspector Results Comments
08/14/2019 BUILDING - FINAL Not ready for Inspection previous correction still not fixed, missing arrestors at washer and dishwasher. House needs address installed. Water heater flue venting is done incorrectly please correct this with three screws per joint and no tape. Also double wall venting needs 1 inch clearance please cut sheet rock back. House needs carbon monoxide alarm outside of sleeping area due to fuel fired appliances. Water heater needs sediment trap. OK to clear gas for reconnection.
07/19/2018 BUILDING - FINAL Denied DRYWALL SCREWS CANNOT BE USED ON REAR DECK
WATER HAMMER ARRESTORS REQUIRED.
07/17/2018 BUILDING - FINAL Denied SECURE REAR PORCH WITH 2.5 CLIPS
MISSIMG WATER HAMMER ARRESTORS
NO ACCES TO ROOF.