Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/24/2018 | ENGINEERING - FINAL | Approved | ||
| 08/06/2018 | ENGINEERING - FINAL | Partial Approval | ||
| 05/09/2018 | ENGINEERING - FINAL | Partial Approval | 1) COMPLET THE POURING THE SIDEWALK ON THE SOUTH SIDE OF THIS BUILDING OR BLOCK THE ACCESS TO THE GENERAL PUBLIC. 2)THE IRRIGATION AND LANSCAPING IS NOT COMPLETED ON THE EAST SIDE OF THIS SITE AND NEEDS TO BE BLOCKED TO PREVENT PUBLIC ACCESS TO THE AREA. 3) THE AC AND ELECTRICAL CONTAINMENT DOES NOT HAVE LOCKING MECHANISMS ON THE ACCESS GATE INTO THIS AREA. THE ACCESS INTO THIS AREA EITHER NEEDS TO BE BARRICADED TO PREVENT ACCESS TO THE GENERAL PUBLIC OR GATE LOCKS NEEDS TO BE PROVIDED FOR SECURITY. |