Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2022 | BUILDING - FINAL | Approved | ||
| 10/03/2019 | BUILDING - FINAL | Partial Approval | PLEASE SUBMIT ROOF TRUSS PLANS PRIOR TO FINAL | |
| 07/02/2019 | BUILDING - FINAL | Not ready for Inspection | previous corrections still not fixed from previous two visits, also missing gable vents. Please build per plan and read notes from previous corrections. This is now the third failed inspection. Another failed inspection will result in a reinspection fee. | |
| 06/28/2019 | BUILDING - FINAL | Denied | Comply with gable end bracing section C Comply with header schedule Pending approval truss calls Provide stoop at exit door 36 inch landing Per approved site plan south setback reads 4 foot. Garage south set back is 3 foot. Submit as built to site plan or build to plan. Any combustible material within 36” of property line must be fire rated |
|
| 06/24/2019 | BUILDING - FINAL | Not ready for Inspection | property locked up no access. See previous notes, Another failed inspection with no forward progress will result in a reinspection fee. | |
| 01/14/2019 | BUILDING - FINAL | Not ready for Inspection | need all corrections fixed. Need footings poured. Need concrete stoop poured at exterior door | |
| 01/10/2019 | BUILDING - FINAL | Cancelled |