Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2018 | FRAMING | Approved | IVRS - Inspection :* | |
| 04/27/2018 | FRAMING | Partial Approval | IVRS - Inspection :* 1- SHALL SEAL ALL TOP PLATE PENETRATIONS WITH FIRE RATED FOAM OR CUALKING. 2- SHALL PROVIDE THE WIDE SHIELDED PLATES ON ALL TOP AND SOLE PLATE THAT HAVE A VTR WITHIN 11/2 INCHES FROM THE EDGE OF STUD. 3- SHALL PROVIDE A DOUBLE FIXTURE FITTING FOR THE DOUBLE LAVATORYS DRAINS. 4- SHALL PROVIDE A WATER TEST ON THE DWV SYSTEM TO THE TOP OF VTR. |