Permit: T18CM00804

Parcel: 11004342D

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
02/13/2018 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
02/08/2018 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999
1- SHALL EXTEND THE FURNACE FLU VENT AND TERMINATE IT 3 FEET ABOVE THE COOLER WHEN LOCATED WITHIN 10 FEET OF COOLER.
2- SHALL SEAL ALL EXTERIOR GAS LINE PENETRATIONS THRU WALLS..
3- SHALL PROVIDE A CARBON MONOXCIDE DETECTOR LOCATED IN THE HALLWAY TO THE BEDROOMS.
4- SHALL BOND THE GAS LINE OR HARD PIPE INTO THE FURNANCE.
5- SHALL PROVIDE A DAMPER KIT AND TO INSTALLED IN A FIXED OPEN POSITION FOR BOTH FIREPLACES.
6- RETEST THE SYSTEM.
7- SHALL PROVIDE A APPROVED DRAWING ON THE GAS SYSTEM.


*