Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2019 | PLUMBING - GAS PRESSURE TEST | Approved | SW Gas Clearance, Reconnect SW GAS was Called for Clearance. Jesse, Reconnect. Done |
|
| 08/03/2018 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL REMOVE THE 1/2 INCH STRESSED GAS PIPING SUPPLY TO THE DRYER AND PROVIDE A OFFSET FITTING. 2- RE TEST THE SYSTEM. 3- NOTE; OKAY TO SHEET ROCK ALL AREAS EXCEPT THE CEILING IN THE FRONT BEDROON. * |