Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/31/2019 | ENGINEERING - FINAL | Approved | Approved per conversation with Dave Roberts. | |
| 11/21/2019 | ENGINEERING - FINAL | Not ready for Inspection | Met with Steve Shields downtown went over plans and aerial view of site. Met with architect on site suggested to meet with Steve Shields downtown to get what needs to be done resolved. | |
| 01/11/2019 | ENGINEERING - FINAL | Not ready for Inspection | Meet with Steve Shields at 201 North Stone about UDC 3.33 H and 10835 for this site. | |
| 11/27/2018 | ENGINEERING - FINAL | Not ready for Inspection | Site not installed per approved site plans. Accessible parking accessible route to building not per approve plans |