Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2018 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 02/02/2018 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE HARD PIPING THRU THE CABINET SIDE WALL THEN LOCATE THE GAS SHUT OFF VALVE AND FLEX CONNECTOR WITH PLUG OR CAP. 2- RETEST THE SYSTEM. * |