Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2019 | PLUMBING - ROUGH, SOIL | Approved | From yesterday PA | |
| 01/09/2019 | PLUMBING - ROUGH, SOIL | Denied | 1- Shall provide and locate a 3 inch Vent on the 3 inch horizontal soil line for the hallway bathroom group. 2- re test the DWV system. |
|
| 01/08/2019 | PLUMBING - ROUGH, SOIL | Partial Approval | plumbing rough soil, pending digging out the remainder of the footing, check again at footing inspection 1005 |