Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/03/2018 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 05/02/2018 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE A MINIMUM TRAP ARM DISTANCE FO TWO TIMES THE PIPE SIZE DIAMETER OF PIPE FOR THE FLOOR DRAINS # 2 & #3. 2- SHALL PROVIDE THE GREASE INTERCEPTOR MANUFACTURER'S INSTALLATION STANDARDS SHOWING THE LOCATION OF THE FLOW CONTROL IF REQUIRED. 3- SHALL EXPOSE THE P.O.C. OF THE NEW BLDG. DRAIN TO THE EXISTING BLDG. DRAIN. 4- RE TEST THE SYSTEM. * |