Inspection History Details
Inspection Status: Partial Approval
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2018 | FIRE - FINAL | Partial Approval | -need sprinkler as builts. modified riser for backflow full forward test. -need alarm as builts. added two sprinkler switches. |
|
| 10/04/2018 | FIRE - FINAL | Approved | ||
| 09/27/2018 | FIRE - FINAL | Partial Approval | -APPROVED TO OBTAIN TCO Still need the following for full final: -reinspection fee added to permit. must be paid prior to next inspection. -need to verify all alarm signals again (entire fire alarm final, again) -mount extinguishers. -eliminate trouble on FACP (network issue). -need knox FDC plugs on FDC's -need to supervise/add tamper switches to control vlaves in street. double back flows. chain/lock for TCO. -will need as builts for alarm. -will need 72/ROC at fire final for alarm. -need as builts for sprinkler system. added bypass and outlets on riser for full forward test. -add door lock indicator on front exit doors. -add decal above front exit doors, this door to remain unlocked when this space is occupied. -lock/chain control valve for extra 2 1/2" outlets for forward flow testing. not required to be monitored per HBrown. -add brass plugs/caps for the extra 2 1/2" outlets. -add red lockout on FA breaker. -need UL cert from central station. -label FACP, 1" letters, sprinkler waterflow and supervisory sytem. -date alarm batteries. -add account # on FACP. |