Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/01/2018 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 01/25/2018 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE A BOND JUMPER ON THE GAS LINE WITH A #6 CONDUCTOR. 2- SHALL PROVIDE A DOUBLE WALL WALL FLU VENT AND TERMINATE A MINIMUM OF 12 INCHES ABOVE THE PARAPIT WALL AND PROVIDE (3) SHEET METAL SCREWS ON THE TANKLESS WATER HEATER DRAFT COLLAR. 3- SHALL PROVIDE THE APPROVED TAPE PRIMER ON ALL UNDERGROUND FITTINGS THEN APPLY THE 10-MIL TAPE WITH THREE TIMES WRAP AND ON ALL PIPE WRENCH MARKS. * |