Permit: T18BU00433

Parcel: 14101006C


Addresses:

5700 S HOUGHTON RD


Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T18BU00433

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
10/07/2019 EXCAVATION/LAYOUT REBAR & ZON Approved
10/02/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection No address posted, see previous notes, another failed inspection will result in a reinspection fee
09/17/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection No address posted, no contact Number, unable to locate anyone on site.
05/21/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval lot 119 NW Retainer ok to pour spread footing.
04/29/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval lot 125, 139 Spread footings ok to pour.
04/17/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval lots 63, 70, & 134 retainers ok to pour footings. (Note: Clean out trash and debris before pour).
04/15/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Lot 144 north wall, Lot 141 south wall, Lot 135 north/south walls, and Lots 90 thru 94 rear retaining wall footings are ok to pour.
Remove all loose material and trash from footings before placement of concrete.
04/05/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Retaining footings ok at 37, 58, 100, 114-116
03/05/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval retaining wall footings for Lots 128, 129, 130, and 131 are ok to pour
03/04/2019 EXCAVATION/LAYOUT REBAR & ZON Correction Required Complete rebar installation and recall for inspection
03/01/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval for lots 157, 158, and 159, side lines only
Lots 128, 129, and 131 not ready, no steel in footings