Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/27/2018 |
BUILDING - FINAL |
|
Approved |
Utilities to site have been terminated. Dry septic tank to be filled in. |
| 09/27/2018 |
BUILDING - FINAL |
|
Continued |
Checked on site - grading not completed, some debris still on site, traffic plates at septic hole still in place, no sewer located, no gravel. |
| 09/18/2018 |
BUILDING - FINAL |
|
Continued |
7'x7'x12' old abandoned septic hole in ground found late 9/17/18. Contractor ordered to place Traffic plates over hole to avoid fall hazzard. City notified. 4" pipe in side of hole appears possible CA material. |
| 08/30/2018 |
BUILDING - FINAL |
|
Continued |
Pre-con downtown. Safety meeting each day by contractor. Contractor CATCLAW n760-0185. Nas 60 days to complete. S.W. Hazzard done. No subs. Start in approx. 1 week. Access to site may be a problem. 2 houses to do at same time. |