Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Basin - Good
Inspection History: COT - BASN - Drainage/Basin - Annual Inspection - Recur
Plan Number - T18BA00091
Inspection Description - COT - BASN - Drainage/Basin - Annual Inspection - Recur
Inspection Status - Basin - Good
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/30/2021 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
10/30/2020 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | DETENTION/BASIN INSPECTION IS FAIR AT THI TIME, MINOR SEDIMENT REMOVAL IN THE BASIN PRIOR TO FINAL APPROVAL OF THE DEVELOPMENT PACKAGE FOR THIS SITE. | |
06/01/2020 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | ||
12/23/2019 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Site in basin still under construction at this time. | |
12/18/2019 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Basin in sight still under construction. | |
08/19/2019 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Basin still under construction. | |
04/17/2019 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | EVERYTHING APPEARS TO BE IN ROUgh STATE AT THIS TIME | |
04/08/2019 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Poor | New Basin cut to grade not complete. | |
08/01/2022 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | GOOD | |
03/01/2022 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | FAIR/LOOKS LIKE NEED MORE RIP RAP .EROSION IS OCCURRING. | |
03/22/2023 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | some water in the basin .from the rain today. | |
11/15/2018 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | SITE UNDER CONSTRUCTION. | |
COT - BASN - Drainage/Basin - Annual Inspection - Recur | Scheduled | |||
03/05/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good |