Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Basin - Good
Inspection History: COT - BASN - Drainage/Basin - Annual Inspection - Recur
Plan Number - T18BA00090
Inspection Description - COT - BASN - Drainage/Basin - Annual Inspection - Recur
Inspection Status - Basin - Good
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/30/2021 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
10/30/2020 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | DETENTION/BASIN INSPECTION IS FAIR, MINOR SEDIMENT REMOVAL FROM THE BASIN IS REQUIRED PRIOR TO THE FINAL APPROVAL OF THE DEVELOPMENT PACKAGE. | |
06/01/2020 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | ||
12/23/2019 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Site in basin still under construction at this time. | |
12/18/2019 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Basin in sight still under construction. | |
08/19/2019 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Basin still under construction. | |
04/17/2019 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | EVERYTHING APPEARS TO BE IN ROUgh STATE AT THIS TIME | |
04/08/2019 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Poor | . New basin grade cut only not complete | |
08/01/2022 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | GOOD | |
03/01/2022 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | FAIR OVERGROWTH OF NATIVE PLANTS. | |
03/22/2023 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | Water in the basin but looks good. | |
11/15/2018 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | SITE UNDER CONSTRUCTION | |
03/05/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
COT - BASN - Drainage/Basin - Annual Inspection - Recur | Scheduled |