Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/17/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
work completed - close permit |
| 03/13/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
one panel of sidewalk was tagged and will need to be replaced - CN |
| 01/04/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
- checked the sidewalk/driveway that was poured on wednesday and 1 panel of sidewalk was out at 2.2% cross slope - CN |
| 12/29/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
- sidewalk/ driveway compaction looked good they plan to pour wednesday - CN |
| 12/27/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
- both sidewalk and driveway area's need a bit more compaction work as there was still some lose area's - CN |
| 12/22/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
spoke with the assitant forman onsite and gave him my card since they had the wrong infromation on there permit, looked at the sidewalk formed up and asked them to re compact the area with a jumping jack and to double check there forms to make sure they were under the 2% required. CN |