Permit: T17RW05298

Parcel: 11713044B


Addresses:

211 S CHURCH AV

Inspection Status: Approved

Inspection History: TDOT-EXCAV GENERAL INSPECTION

Date Description Inspector Results Comments
01/30/2018 TDOT-EXCAV GENERAL INSPECTION Approved completed pavement patch - CLose permit
01/29/2018 TDOT-EXCAV GENERAL INSPECTION Continued poured concrete cap on trench across church they plan repaving church tomorrow - CN
01/22/2018 TDOT-EXCAV GENERAL INSPECTION Continued had them move there porta pott per down towns request - CN
01/18/2018 TDOT-EXCAV GENERAL INSPECTION Continued working on conduit run crossing the sidewalk at jackson and in the south side of the toffel area - CN
01/17/2018 TDOT-EXCAV GENERAL INSPECTION Continued inside toffels area trenching to lay conduit - cn
01/12/2018 TDOT-EXCAV GENERAL INSPECTION Continued poured back concrete square by the tcc to match existing and were also installing conduit in toffels closure on the east side of church. CN
01/11/2018 TDOT-EXCAV GENERAL INSPECTION Continued placed brick work back and trenching on the east side of the roadway by toffels work site - CN
01/09/2018 TDOT-EXCAV GENERAL INSPECTION Continued they were trenching in the roadway, cold patching for access, they also had there traffic control set up according to the plans - CN
01/03/2018 TDOT-EXCAV GENERAL INSPECTION Continued they had started on brick removal , saw cutting, utility pot hole locations - CN
12/28/2017 TDOT-EXCAV GENERAL INSPECTION Continued ped walk path setup, but no other work going on - CN
12/20/2017 TDOT-EXCAV GENERAL INSPECTION Continued had stuff onsite to setup ped access but other then that no sign of work going on - CN
12/13/2017 TDOT-EXCAV GENERAL INSPECTION Continued went over the job detiails i noticed they didnt have a ped access detour plan so i asked them to submit one. i also reminded them that there work cant interfear with events at tcc. they plan on starting to pothole on friday - CN