Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 01/30/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
completed pavement patch - CLose permit |
| 01/29/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
poured concrete cap on trench across church they plan repaving church tomorrow - CN |
| 01/22/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
had them move there porta pott per down towns request - CN |
| 01/18/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
working on conduit run crossing the sidewalk at jackson and in the south side of the toffel area - CN |
| 01/17/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
inside toffels area trenching to lay conduit - cn |
| 01/12/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
poured back concrete square by the tcc to match existing and were also installing conduit in toffels closure on the east side of church. CN |
| 01/11/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
placed brick work back and trenching on the east side of the roadway by toffels work site - CN |
| 01/09/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
they were trenching in the roadway, cold patching for access, they also had there traffic control set up according to the plans - CN |
| 01/03/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
they had started on brick removal , saw cutting, utility pot hole locations - CN |
| 12/28/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
ped walk path setup, but no other work going on - CN |
| 12/20/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
had stuff onsite to setup ped access but other then that no sign of work going on - CN |
| 12/13/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
went over the job detiails i noticed they didnt have a ped access detour plan so i asked them to submit one. i also reminded them that there work cant interfear with events at tcc. they plan on starting to pothole on friday - CN |