Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/25/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
work completed - close permit |
| 04/12/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
working on water main will pave electric at the same time - CN |
| 01/08/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
temp patch in rdwy, left a message for contractor to call me about perm patch, they will due the perm patch once they install the water line in the same area - CN |
| 11/28/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
- started the excavation for the install of electrical lines - CN |