Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 01/09/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Work completed patch looks good. ( Tucson Water ) |
| 11/06/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Permanent patch complete, only remaining work is the thermal skip lines need to be applied. |
| 10/25/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Temporary skip lines in place on this permanent patch on the two WB lanes of Pima at the address. |