Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | JOB HAS BEEN COMPLETED AS CLOSE TO SPECS AS POSSIBLE | |
| 11/07/2018 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | CALLED BOB TO RENEW PERMIT REMINDED TO T-TOP ASPHALT PATCHES SUBGRADE ON SIDEWALK PANELS IS GOOD TO POUR (JEFFERSON) |
|
| 09/14/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | CONTRACTOR STILL IN AREA LET THEM KNOW TO KEEP AREA CLEAN NEED TO GRADE ENTRYS INTO ALLEYS |
|
| 08/28/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | DRIVEWAYS ON JAUREZ HAVE BEEN COMPLETED TOLD CONTRACTOR TO CLEAN UP AROUND DRIVEWAYS BEFORE THEY MOVE ON |
|
| 08/23/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | SUBGRADE GOOD ON 5 DRIVEWAYS ON JAUREZ POURING THIS MORNING |
|
| 08/08/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | CONTRACTOR STILL ON SITE | |
| 06/20/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | CONTRACTOR IS ONSITE | |
| 06/19/2018 | TDOT-EXCAV GENERAL INSPECTION | Meeting | ASKED CONTRACTOR TO TRY TO KEEP AREA CLEAN | |
| 06/14/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | REPLACING ASPHALT AT 25TH AND CRAYCROFT. REMOVE AND FORM SIDEWALK SECTIONS. SUBGRADE IS OK | |
| 06/08/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | REPAIRING PATCH ON 24TH AT CRAYCROFT | |
| 06/06/2018 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | COMPLAINT AT 24TH AND CRAYCROFT. ROUGH PATCH. ASPHALT CREW IS ON SITE FRIDAY WILL BE REPAVED THEN |
|
| 06/05/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | MEETING TODAY. TOLD THEM TO CLEAN STREETS A LITTLE BETTER. TRAFFIC CONTROL IS GOOD. FLAGGERS ON SITE | |
| 05/22/2018 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | TOLD TO RENEW PERMIT FLAGGERS ON SITE |
|
| 05/18/2018 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | NOT WORKING TODAY. AREA IS PICKED UP BUT THE STREETS ARE DIRTY. | |
| 04/26/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 04/17/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | ON CRAYCROFT TRAFFIC CONTROL IS GOOD | |
| 04/13/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | DID NOT SEE THEM ON SITE TODAY | |
| 04/04/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | ON CRAYCROFT SHOULDER | |
| 04/03/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | CONSTRUCTION MEETING | |
| 03/20/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | MEETING WITH TANG. | |
| 02/23/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | WORKING ON 22ND | |
| 02/16/2018 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | ASKED TO CLEAN UP MUD ON VAN BUREN. 2 GUYS AT 22ND AND CRAYCROFT | |
| 02/15/2018 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | LEFT TRENCH UNCOVERED AT 22ND AND CRAYCROFT GABE WAS CALLED OUT. HAD THEM DO ALL STORM WATER STUFF. |
|
| 02/14/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | ON CRAYCROFT AT 22ND | |
| 01/30/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | TWO FLAGGERS ON SITE | |
| 01/22/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | NOT WORKING TODAY | |
| 01/18/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | NOT WORKING TODAY | |
| 01/17/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | NOT WORKING TODAY | |
| 01/16/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | NOT WORKING TODAY | |
| 01/11/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | SCRAPPED THE ROAD OF MUD | |
| 01/10/2018 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | MUDDY TOLD CONTRACTOR TO CLEAN AREA | |
| 12/29/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | FLAGGERS ON SITE | |
| 12/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | TOLD HIM IT WAS OK TO GO TO CURB WITH ASPHALT AND A FOOT ON THE ROADWAY SIDE | |
| 12/26/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | NOT WORKING TODAY | |
| 12/22/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 12/21/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 12/11/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | FLAGGER CERTS, SWPP,T-TOP, COMPACTION | |
| 12/07/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 12/05/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 12/04/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 11/30/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 11/29/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 11/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 11/15/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 11/06/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | PRECON WITH DESERT BARRICADES AND JAUN FROM INNOVA T-TOP ANY PATCHES UNDER 4 FT. MILL PLATES IF LEFT LONGER THAN 3 DAYS. NO WORK ON CRAYCROFT AFTER THANKSGIVING |
|
| 11/02/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 11/01/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | PRECON ON 11-6 9AM | |
| 10/31/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 10/27/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 10/25/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection |