Permit: T17RW04363

Parcel: 138111720


Addresses:

6107 S 6TH AV

Inspection Status: Approved

Inspection History: TDOT-EXCAV GENERAL INSPECTION

Date Description Inspector Results Comments
12/12/2017 TDOT-EXCAV GENERAL INSPECTION Approved final walk through at 9:30 to 10:30 with the park guys, they had some small clean up request, but work is completed - close permit
12/07/2017 TDOT-EXCAV GENERAL INSPECTION Continued started paving alley area - will due a final walk with kyle tomorrow - CN
12/06/2017 TDOT-EXCAV GENERAL INSPECTION Continued kyle called and said they had reworked the alleyway SG. I checked it out it seemed to be good to go. i let kyle know - CN
12/05/2017 TDOT-EXCAV GENERAL INSPECTION Continued stopped by and looked at the area of asphalt they removed and will be working the SG - CN
11/28/2017 TDOT-EXCAV GENERAL INSPECTION Continued walk through of job with kyle and the parks. kyle still has an area of alley way to remove and repave - CN
11/21/2017 TDOT-EXCAV GENERAL INSPECTION Continued walked the job pointed out a few things to fix before final walk through - CN
11/15/2017 TDOT-EXCAV GENERAL INSPECTION Continued weekly meeting , looked at the aphalt that was placed last week while i was in a training - CN
11/08/2017 TDOT-EXCAV GENERAL INSPECTION Continued - prepping to pave the path way today. paved
11/07/2017 TDOT-EXCAV GENERAL INSPECTION Continued poured header curbs - CN
11/03/2017 TDOT-EXCAV GENERAL INSPECTION Continued looked at the header curbs that will be poured tomorrow at 8:00am - CN
10/30/2017 TDOT-EXCAV GENERAL INSPECTION Continued - kyle had the tester out testing the subgrade by the park - CN
10/25/2017 TDOT-EXCAV GENERAL INSPECTION Continued compaction testing was supposed to be done at 8am and the meeting at 9am was cancelled. i was there around 9am and the testing
company still hadnt showed up. kyle and i walked the job and looked at everything they had done since i was out there last.
10/17/2017 TDOT-EXCAV GENERAL INSPECTION Continued subgrade density didnt pass - kyle will rework area - CN
10/17/2017 TDOT-EXCAV GENERAL INSPECTION Continued meeting from 9am to 10am with parks and rec and kyle for the park path job - CN
10/17/2017 TDOT-EXCAV GENERAL INSPECTION Continued 2nd time out today - conformatech back out to check SG density, First set of test's didnt pass only 91% and 16% moisture - CN
10/12/2017 TDOT-EXCAV GENERAL INSPECTION Continued - meet with kyle and walked the job and went over work to be done - CN