Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 11/01/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
SWG permit, gas connection has already been done for Elementary Place (PIA project). There is a permanent asphalt patch in the WB lane of Pima (T-topped) which is acceptable. The trench across the EB lane of Pima will be paved over as a part of the paving for the new subdivision (currently blue-topped for AB and ready to pave asphalt lift). All other excavation out of ROW. No issues. Final. |