Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/26/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | NO ISSUES | |
| 12/14/2017 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | ALL RAMPS POURED AS ONE PIECE NEEDS EXPANSION JOINT ON BACK SOME OF THE SIDEWALK ON THE BRIDGE IS OUT OF SPECK |
|
| 12/14/2017 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | MET WITH MATT S., PETE C., AND GRANITE THEY WILL REPLACE ALL OUT OF SPECK SIDEWALK AND THE NORTHWEST DRIVEWAY RAMP. MATT S. SAID TO FIX THE PANEL ON THE SOUTHWEST RAMP BUT DID NOT NEED TO PLACE EXPANSION JOINT TO KEEP THEM ALL THE SAME | |
| 11/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL HAS BEEN REMOVED | |
| 10/31/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 10/16/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | SUBGRADE IN SIDEWALK AREA GOOD | |
| 10/13/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 10/12/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 10/11/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | I LOOKED AT THE SIDEWALK SUBGRADE THATS READY. GOOD TO POUR. PETE WILL MEET ME OUT THERE TOMORROW TO LOOK AT FOOTERS OF PED BRIDGE. |