Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 01/09/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Work is completed. Patch looks good. ( SWG ) |
| 11/03/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
SWG temporary patch in place, no work. |
| 10/30/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
SWG permit, still requires a permanent trench patch across Columbus at the address. No workers present. |
| 10/23/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
SWG permit; 2 flags of concrete on the east side and 1 on the west side of Columbus have been replaced at the address. Cold patch on trench across the roadway, still requires a permanent asphalt patch. This permit has expired. Will notify SWG that the permit needs to be renewed and the repairs completed. |