Date Description Inspector Results Comments
08/31/2018 TDOT-EXCAV GENERAL INSPECTION Approved areas that were looked at by pete and i have been replcaed - Close permit
07/31/2018 TDOT-EXCAV GENERAL INSPECTION Continued npl onsite milling bad patched areas - CN
07/24/2018 TDOT-EXCAV GENERAL INSPECTION Continued jimmy said he was hoping to start this week on fixing the patches - CN
06/22/2018 TDOT-EXCAV GENERAL INSPECTION Continued pete and i had a meeting with jimmy from NPL & he will replace 4 patches along valencia - CN
06/19/2018 TDOT-EXCAV GENERAL INSPECTION Continued got with jimmy and he said that he would get back with me on a time and day to meet this week to look at the patches that need to be redone - meeting set for friday at 8am - CN
05/22/2018 TDOT-EXCAV GENERAL INSPECTION Continued Meet with jimmy from npl showed him 4 bad patches along valencia from the pizza hut to the big o tire- i recommened that they use a straight edge while paving and when they repave these areas- CN
05/03/2018 TDOT-EXCAV GENERAL INSPECTION Continued no work going on, not all patching complete - CN
04/27/2018 TDOT-EXCAV GENERAL INSPECTION Continued drove the patches done by NPL they are still rough. i asked matt to drive them over the weekend so that i could get another opinion on it before telling NPL to redo it - CN
04/18/2018 TDOT-EXCAV GENERAL INSPECTION Continued called jimmy with NPL and let him know that when i drove the first couple of patches they did and they were a little rough over by pizza hut - CN
04/03/2018 TDOT-EXCAV GENERAL INSPECTION Continued meet with jimmy from npl and they had started paving and dowling, pouring concrete along valencia. work is slow going and it will take them another 3 weeks or so to finish - CN
02/26/2018 TDOT-EXCAV GENERAL INSPECTION Continued meet with npl jimmy, pete and myself to go over paving and concrete patching on valencia - CN
02/23/2018 TDOT-EXCAV GENERAL INSPECTION Continued working on gas tie ins - cn
02/12/2018 TDOT-EXCAV GENERAL INSPECTION Continued had a meeting with SWG and bryan from npl , pete , myself to talk about the driveway @ headly "patch" issue. the resolution was pushed higher to david, lance and matt - CN
01/30/2018 TDOT-EXCAV GENERAL INSPECTION Continued - NPL installing gas line along valencia - CN
12/12/2017 TDOT-EXCAV GENERAL INSPECTION Continued job is on hold due to the city holiday traffic restrictions - CN
12/06/2017 TDOT-EXCAV GENERAL INSPECTION Continued - went back out and checked on the bumpy patches, seems they have fixed some but others were still bumpy(not bad if you do the speed limit). i didnt see anyone working on the other patches. - CN
11/29/2017 TDOT-EXCAV GENERAL INSPECTION Continued had meeting with matt and brian from npl about fixing the temp patchs that road rough along the south side of valencia. they wanted to hot patch but wanted to have a 3 day right lane close to complete the work matt took it down town and they said no. I told brian and jim that they couldnt have a 3 day closure and could only use a shadow truck which is what was suggested in the meeting by matt to be able to fix the patches.
11/08/2017 TDOT-EXCAV GENERAL INSPECTION Continued still working, talked about permit that will expire soon and that the perm patching must be done per standards
10/12/2017 TDOT-EXCAV GENERAL INSPECTION Continued Still boring along along valencia, traffic control setup per the permit -CN
09/12/2017 TDOT-EXCAV GENERAL INSPECTION Continued boring for gas line on valencia, called dana about permit renewal, he said it was already in the works
08/31/2017 TDOT-EXCAV GENERAL INSPECTION Continued started milling for the NPL boring - CN