Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 03/21/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
they did what pete asked them to do - close permit |
| 12/18/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with contractor there were a few new issues that were created when he repoured 2 panels of a driveway. i asked pete to come out and take a look. pete wanted the contractor to grind one area and then he said that he was okay with the other 2 other issues. one being out on the cross slope and one being out on the 2% running slope in driveway. - CN |
| 12/11/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
contractor called and said he was onsite. I marked out 2 panels that pete wanted removed- cn |
| 12/08/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
pete and i went out and checked on the attempted fixes to the driveway wings, pete wasnt happy and wants it replaced - i called permit holder and told him it needed to be redone - CN |
| 12/04/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
both wings of the driveway was finished wrong had pete out to look at it. one wing was over 8.3% and the other the cross slope is over 2.5%. I had the owner out at 10am for a meeting and let him know what they issues were and he said that they would get fixed - |
| 11/29/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
went back out and looked at the layout of the driveway and reexplained how it needed to be with the guys pouring it. the driveway will be poured after 8:30 am - CN |
| 11/28/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
they removed driveway and had questions on how to lay it out so i stopped by and reexplained specs for a driveway - CN |
| 11/22/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
pete and i went out and meet with them and let them know that the existing driveway would need to be removed and replaced in spec. CN |
| 11/21/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
removing sidewalk wings - stopped and told them that they dont have a valid permit- called down town to let them know and also called pete - richard called from down town and said that they have to do the driveway to spec. CN |
| 10/27/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Correction Required |
Met with pete on the water line install in driveway, patch/driveway needs to be fixed/replaced before cfo is given - CO |
| 09/28/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
talked with marcos again about removing the broad in the driveway/ROW access. he said that he would get right on it - CN |
| 08/21/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
- line had been run but a board was placed over there hole in the ped access. i called the contractor and asked him to bf and remove the board out of row and the ped access. |